PROJECT: 50mtr x 25mtr Floating Pontoon and 50mtr access Walkway Bridge
Tema protective coatings were involved with Tema Engineering with regards to the manufacture and installation on this project. We were requested to carry out an Internal & External specification to the pontoon structure.
Specification Pontoon
Internal …Two coats of a High build Modified epoxy @ 500mic
External . .One coat of High build Primer .50-75mic
Two coat of High build modified epoxy… 400mic
One coat of a Polyurethane finish… 50mic
Specification… Walkway Bridge
One coat of zinc rich epoxy @ 75mic
One coat of High build MIO @ 150MIC
One coat of a high build mio finish coat @ 75mic