Pro Steel / Bam Nuttals
PROJECT: Q6 Olympic park Road bridge refurbishment 60 x 4.5 mtr span
WHAT WE DID:
The Bridge section was dismantled and delivered to Tema Protective coatings In house painting facility, Tema was requested to carry out a Highways maintenance specification Item 115, Item 116 ITEM 168 to comply with the HAP1 Form. The bridge section and bridge deck beams was fully rephurbished to a high standard , then transported to London Olympic park, where it was re-erected on site, Tema carried out site repairs to the structure and carried out a full paint system to all connection areas.